Fujitsu F2 MC-16 Manuel D’Utilisation
![Fujitsu](https://files.manualsbrain.com/attachments/6c4642b33d2edbd09f94719c20a133aa0e862902/common/fit/150/50/80a45702a21fefb1823bce6851e87db450dccf7792cb572ebc8a90330a68/brand_logo.png)
165
CHAPTER 2 DEPENDENCE FUNCTIONS
2.3.5.1
Setting Sequencer
The sequencer operates in the following order:
1) The sequencer starts after the program execution.
2) Depending on the setting at each level (1 & 2), branching to the next level is performed
1) The sequencer starts after the program execution.
2) Depending on the setting at each level (1 & 2), branching to the next level is performed
when the condition is met.
3) The sequencer is restarted when the restart condition is met.
4) The sequencer is terminated and a break occurs when the level 3 condition is met.
4) The sequencer is terminated and a break occurs when the level 3 condition is met.
■
Setting Sequencer
The sequencer operates in the following order: The event can be set at each level and as a restart condition.
1. The sequencer starts after the program execution.
2. Depending on the setting at each level (1 & 2), branching to the next level is performed when the
condition is met.
3. The sequencer is restarted when the restart condition is met.
4. The sequencer is terminated and a break occurs when the level 3 condition is met.
Use the following commands to set the sequencer.
SET SEQUENCE: Setting an event for the sequencer
[Example]
>SET SEQUENCE 1, 3, 2, r=4
Set event 1, 3, 2 to level 1, 2, 3 respectively, and event 4 for the restart condition.