Heat & Glo LifeStyle GEM36 Manuel D’Utilisation
11
Heat & Glo • GEM36 • 370-900 Rev. O • 2/05
Framing should be
constructed of 2 X 4
lumber or heavier.
constructed of 2 X 4
lumber or heavier.
A. ................ 41-1/2”
B. ....................... 43”
C. ................ 17-1/2”
D. ................ 54-1/2”
E.** ......... 22-15/16”
F.* ............... 49-1/2”
Figure 3.
Framing Dimensions
Step 2. Framing the Fireplace
Fireplace framing can be built before or after the fireplace is
set in place. Framing should be positioned to accommo-
date wall coverings and fireplace facing material. The dia-
gram below shows framing reference dimensions.
set in place. Framing should be positioned to accommo-
date wall coverings and fireplace facing material. The dia-
gram below shows framing reference dimensions.
CAUTION: MEASURE FIREPLACE DIMENSIONS AND
VERIFY FRAMING METHODS AND WALL COVERING
DETAILS BEFORE FRAMING.
VERIFY FRAMING METHODS AND WALL COVERING
DETAILS BEFORE FRAMING.
Shows center of 10” x 12” vent framing
holes for top and rear venting. The center
of the hole is one (1) inch (25.4mm) above
the center of the horizontal vent pipe.
holes for top and rear venting. The center
of the hole is one (1) inch (25.4mm) above
the center of the horizontal vent pipe.
F
A
C
B
1/2” CLEARANCE TO
FRAMING MEMBER
1/2” CLEARANCE
FRAMING
MEMBER
1/2” CLEARANCE
FROM BOTH SIDES
OF FIREPLACE
TO COMBUSTIBLE
1/2” CLEARANCE FROM BACK OF FIREPLACE TO COMBUSTIBLE
Note: Remove cover
plate (if present).
* Studs labeled “F” are necessary if installing the optional Arched Gem
Stone Kits (BKMS6052, BEMS6052, GRS6052)
** Heat-Out framing is 12 inches wide by 10 inches tall, opposite of vent
framing. Center of Heat-Out framing is 1-1/16 inch LOWER than the
center of the Heat-Out pipe.
center of the Heat-Out pipe.
D
E
HE
AT
-OU
T