Manuel D’UtilisationTable des matièresNotices3FCC notice3Laser compliance statement4Important safety instructions51 System tour11Features summary13External and internal structure14Front bezel14Front panel16Rear panel19Internal components22System boards24Mainboard layout24Hot Plug HDD Cage backplane board layout282 System setup29Setting up the system31Preinstallation requirements31Connecting peripherals32To connect the PS/2 keyboard32To connect the PS/2 mouse33To connect the VGA monitor34To connect a printer35To connect the power cable36Turning on the system37Power-on problems38Operating system configuration39Network connection40Tower-to-rack option41Turning off the system423 Upgrading the system45Upgrading the system47Installation precautions47Opening the server49Before opening the server49To open the front bezel49To remove the front bezel50To remove the inner (front) panel51To remove the side panel52Configuring the Hot Plug HDD cage54To remove the Hot Plug HDD cage54To install a hard disk into the Hot Plug HDD cage hard disk carrier55To install the Hot Plug HDD cage57Configuring the non-Hot Plug HDD cable cage59To remove the HDD cable cage59To install a hard disk into the HDD cable cage60To install the SCSI cable cage61Installing and removing storage devices62To replace the 3.5-inch floppy drive62To install a 5.25-inch storage device64Upgrading the CPU66To remove a CPU with heatsink66Processor Sequence68To install a CPU with heatsink68Upgrading the system memory70To remove a DIMM70To install a DIMM71Installing an expansion card72To install an expansion card72Installing a redundant power supply module74To install a redundant power supply module754 BIOS setup79BIOS setup81Entering BIOS setup82Main84Advanced86Super I/O Configuration87IDE Configuration88Floppy Configuration92PCI/PnP Configuration93Boot Settings Configuration95Event Log Configuration97Onboard Devices Configuration100Power101Boot103Boot Device Priority103Hard Disk Drives105Removable Devices106ATAPI CD-ROM Devices107Security108To set a Supervisor/User password109To change the Supervisor/User password109To remove the User password109Exit110Appendix A: ASM Quick Installation Guide113Installing ASM115System requirements115System setup115Appendix B: Altos G510 Rack Installation Guide117System rack installation119Screw types for rack installation121Installing the system into the rack122Index133Taille: 18 MoPages: 134Language: EnglishOuvrir le manuel