Mode D'Emploi (CSE-811T-300B)Table des matièresOverview1Shipping List1Part Numbers1Contacting SuperMicro1Where to get Replacement Components1Overview1Warnings and Precautions1Preparing for Setup1Electrical Safety Precautions2General Safety Precautions3System Safety3Overview3Control Panel Buttons3Control Panel LEDs3Drive Carrier LEDs3SAS/SATA Drives3SCSI Drives3Overview4Installation Steps4Installation Step 1: Remove the Chassis Cover4To remove the chassis cover:4Installation Step 2: Install Hard Drives4To remove hard drive trays from the chassis4To install a hard drive to the hard drive tray4Installation Step 3: Installing the Motherboard4To install the motherboard:4Add-on Card/Expansion Slot Setup4To install an add-on card:4Installation Step 4: Installing the Air Shroud4To install the air shroud4To check the server's air flow4Installation Complete4System Blowers4To change a system blower4Power Supply4To change the power supply4Other Chassis Components4To change the DVD4To change the Control Panel4Overview5Unpacking the System5Preparing for Setup5Choosing a Setup Location5Rack Precautions5General Server Precautions5Rack Mounting Considerations5Ambient Operating Temperature5Reduced Airflow5Mechanical Loading5Circuit Overloading5Reliable Ground5Rack Mounting Instructions5Identifying the Sections of the Rails5Rail Brackets5To separate the inner and outer rails:5To install the inner rail to the chassis:5To install the outer rails to the rack:5To install the chassis into a rack:5Telco (Two Post) Racks5To install the chassis into a Telco rack:5Taille: 12 MoPages: 54Language: EnglishOuvrir le manuel