Manuel D’UtilisationTable des matières1 Overview11.1 Introduction to Micro-BTS11.2 Installation Overview11.3 Installation Flow11.4 Points for Attention12 Preparations22.1 Installation Environment Check22.1.1 Checking Equipment Building Conditions22.1.2 Checking Indoor Environment22.1.3 Checking Power Supply System22.1.4 Checking Grounding System22.1.5 Checking Relative Devices22.2 Tools and Instruments22.3 Technical Documents23 Open-box Inspection33.1 Checking Packing List and Goods33.2 Packaging33.3 Open-box Procedures34 Installation of Cabinet44.1 Installation Flow44.2 Installation Modes44.2.1 Installing Cabinet on Pole44.2.2 Installing Cabinet on Wall45 Installation of Power Supply System55.1 Introduction to Power Cables55.1.1 -48V DC Power Cable55.1.2 120V AC Power Cable55.2 Connection of Power Cables55.3 Assembling Power Cable Connector55.3.1 Assembling -48V DC Power Cable Connector55.3.2 Assembling 120V AC Power Cable Connector56 Installation of Grounding System66.1 Introduction to the Grounding System66.2 Installing Grounding System66.2.1 Installing Outdoor Grounding Copper Busbar66.2.2 Installing the Grounding System of Micro-BTS66.2.3 Installing Feeder Cable Grounding Kit67 Connection of Cables77.1 Checking Internal Cable Connections77.1.1 Type and Configuration of Internal Cables77.1.2 Connection of Internal Cables77.2 Connecting External Cables77.2.1 Connecting Optical Fiber77.2.2 Connecting Multi-carrier Interconnection RF Cables77.2.3 Waterproof Processing of Joints77.2.4 Connection of Trunk Cables78 Installation of Primary Antenna Feeder System88.1 Preparations88.1.1 Installation Personnel88.1.2 Installation Environment88.1.3 Security Measures88.1.4 Installation Tools88.2 Composition and Installation Requirements of Antenna Feeder System88.2.1 Composition88.2.2 Technical Parameters88.3 Installation Flow88.4 Installation of Antenna88.4.1 Determining Installation Location88.4.2 Installing Accessories of Directional Antenna88.4.3 Transporting and Raising Antenna88.4.4 Installing and Adjusting Directional Antenna88.4.5 Installing and Adjusting Omni Antenna88.4.6 Connecting Jumper Cable with Antenna and Sealing Their Joint88.5 Installation of Feeder Cable Window88.6 Connection of Feeder Cable88.6.1 Determining Route for Feeder Cable88.6.2 Assembling Connectors of Primary Feeder Cable88.6.3 Cutting Feeder Cable88.6.4 Raising Primary Feeder Cable88.6.5 Laying and Fastening Primary Feeder Cable88.6.6 Connecting Jumper Cable with Feeder Cable and Sealing Their Joint88.6.7 Leading Primary Feeder Cable into Equipment Room88.6.8 Connecting Indoor Jumper Cable88.7 Grounding System of Micro-BTS88.8 Test of Antenna Feeder System88.9 Waterproof Processing of Connectors89 Installation of GPS Antenna Feeder System99.1 Preparations99.1.1 Installation Personnel99.1.2 Installation Environment99.1.3 Security Measures99.1.4 Installation Tools99.2 Composition of GPS Antenna Feeder System99.3 Installation Procedures99.4 Test of Antenna Feeder System910 Installation of Internal Modules1010.1 Overview1010.1.1 Logical Positions of Equipment Modules1010.1.2 Layout of Internal Modules1010.1.3 Functions of the Modules1010.2 Module Installation Flow1010.3 Installation and Replacement of Modules1010.3.1 Installation Sequence1010.3.2 Table of Cable Connections1010.3.3 Fastening and Bundling of Internal Cables1010.3.4 Installation of OIM1010.3.5 Installation of LFM1010.4 Points for Attention1011 Hardware Installation Check1111.1 Checking Components in the Cabinet1111.2 Checking the Cabinet1111.3 Checking Cables1111.4 Checking Power Cables and Grounding Cables1111.5 Checking T1 Cables1111.6 Checking Indoor 1/2” Jumper Cables1111.7 Checking Primary Feeder Cables and GPS Feeder Cables1111.8 Checking Water-blocking Curve for Feeder Cable Window and Primary Feeder Cables1111.9 Checking Hangers1111.10 Checking Outdoor 1/2” Jumper Cables1111.11 Checking Antenna1111.12 Checking Standing Wave Ratio of Feeder Cables1111.13 Checking Indoor and Outdoor Environment1112 Power-on and Power-off1212.1 Checking Components in the Cabinet before Power-on1212.2 Checking External Cables before Power-on1212.3 Powering on/off the Cabinet1213 Installing the Integrated Micro-BTS1313.1 Introduction to the Solution of Micro-BTS Integration1313.1.1 Implementation of the Micro-BTS Integration1313.1.2 Micro-BTS Integration Solution1313.1.3 Module Layout of the Integrated Micro-BTS and RF Remote Station1313.1.4 Networking Modes of the Integrated SDH1313.2 Installing the Built-in SDH of Micro-BTS1313.2.1 Position and Internal Connection of the Built-in SDH in the Micro-BTS1313.2.2 Connecting the External Optical Fibers and Cables During Installation1313.3 Installing the Integrated UPS of Micro-BTS/RF Remote Station1313.3.1 Introduction to ZXUPS L0101313.3.2 Precautions for UPS Installation1313.3.3 Structural Feature and Installation Mode of UPS1313.3.4 Installing the Engineering Cables of L010UPS1313.3.5 Installing UPS1313.4 Installing the Ancillary Combinational Power Supply of Micro-BTS/RF Remote Station1313.4.1 Installing the Outdoor Power Box1313.4.2 Installing the Outdoor Battery Box1313.4.3 Cable Connection for Outdoor Power Box13Structure of ZXCBTS M800T Micro-BTS1Structure of Remote Stations1Connection between Remote Station and Macro-BTS1Connection between Remote Station and Macro-BTS1Schematic Diagram of the Hardware Installation of Micro-BTS/Remote Station1Hardware Installation Flow Diagram1Packing Box for ZXCBTS Cabinet3Schematic Diagram for Opening a Box3Flow of Installing the Cabinet4Schematic Diagram of Fastening the Cabinet onto the Pole (step 1)4Schematic Diagram of Fastening the Cabinet onto the Pole (step 2)4Schematic Diagram of Fastening the Cabinet onto the Pole (step 3)4Schematic Diagram of the Cabinet Fastened onto the Pole4Schematic Diagram of Installing the Support onto the Wall4Schematic Diagram of Installing the Cabinet onto the Wall4Four-pin Connector and Four-core Power Cable5Connection of Power Cables and Grounding Cables at the Bottom of a Cabinet5Assembling a Power Cable Connector (step 1)5Assembling a Power Cable Connector (step 2)5Assembling a Power Cable Connector (step 4)5Assembling a Power Cable Connector (step 5)5Assembling a Power Cable Connector (step 6)5Schematic Diagram of Grounding Connections6Appearance of a Grounding Copper Busbar6Connection of Power Cable and PGND Cable at the Bottom of a Cabinet6Structure of a Grounding Kit6Structure of Optical Fiber (1)7Structure of Optical Fiber (2)7Structure of Optical Fiber (3)7Structure of Optical Fiber (4)7Schematic Diagram of Connecting Optical Fiber7Connection of Interconnection RF Cables7Connection of T1 Cables7Typical Structure of the Antenna Feeder System8Antenna Installation Flow8Installation of the KATHREIN Antenna8Schematic Diagram of Raising the Antenna to the Tower Top8Schematic Diagram of Adjusting the Pitch Angle of the Antenna8Structure of a Feeder Cable Window8Structure of the Feeder Cable of a Micro-BTS/Remote Station8Cutter for Assembling 7/8” Feeder Cable Connectors8Schematic Diagram of Cutting the Feeder Cable with the Cutter8Schematic Diagram of Correct Cutting Size8Schematic Diagram of Expanding the External Copper Conductor8Schematic Diagram of Pulling the Feeder Cable Up the Tower8Appearance of a Hanger8Schematic Diagram of Wrapping Waterproof Adhesive Tape (1)8Fig. 8.6-11 Schematic Diagram of Wrapping Waterproof Adhesive Tape (2)8Schematic Diagram of Wrapping Waterproof Adhesive Tape (3)8Leading the Feeder Cable into the Equipment Room - Mode 18Leading the Feeder Cable into the Equipment Room - Mode 28Structure of a Grounding Kit8Composition of the GPS Antenna Feeder System9Schematic Diagram of Length of Cable Sheath to be Stripped9Schematic Diagram of Soldering the Core Wire with the Pin9Structure of N-J7A9Modules and Boards in R800T/R801T/R802T/R190T/R191T/R192T10Layout of Modules in a ZXCBTS Micro-BTS10Layout of Modules in a ZXCBTS Remote Station10Module Installation Flow Diagram10Schematic Diagram of Bundling Internal Cables (1)10Schematic Diagram of Bundling Internal Cables (2)10Schematic Diagram of Bundling Internal Cables (3)10Corresponding Relations between OIM Expansion Slots in BDM and Sectors10Schematic Diagram of Inserting the OIM into the BDM10Setting of S112Fig. 13.1-1 Solution (I) of Micro-BTS Integration13Fig. 13.1-2 Solution (II) of Micro-BTS Integration13Fig. 13.1-3 Layout of Modules in the ZXCBTS micro-BTS13Fig. 13.2-1 Cable Layout of the Built-in SDH in the CDMA Micro-BTS13Fig. 13.2-3 Connection of the Optical Fiber13Fig. 13.3-1 Appearance of the ZXUPS L010 Series13Fig. 13.3-2 Inner Structure of the ZXUPS L010 Series13Fig. 13.3-4 Layout of the Monitoring Cables of the CDMA Micro-BTS 485/Dry Contact13Fig. 13.4-6 Output Connecting Terminal of the Dry Contact13Table 1.1-1 List of ZXCBTS Micro-BTS/Remote Stations (800MHz)1Table 1.1-2 List of ZXCBTS Micro-BTS/Remote Stations (1900MHz)1Table 2.2-1 Tools and Instruments Needed for the Installation2Table 5.1-1 Corresponding Relationship between Core Wires and Binding Posts5Table 5.1-2 Corresponding Relationship between Core Wires and Binding Posts5Corresponding Relationship between Core Wires and Binding Posts5Table 7.1-1 List of Types and Configurations of Internal Cables7Table 13.2-1 Cable Connection of the Built-in SDH inside the CDMA Micro-BTS13Table 13.3-1 From-to-list of the CDMA Micro-BTS 485/dry contact supplementary cables13Taille: 1,8 MoPages: 201Language: EnglishOuvrir le manuel