Teledyne LXT-220 Manuale Utente

Pagina di 61
Dissolved Oxygen Controller  
Installation 
 
 
 
Teledyne Analytical Instruments 
19
 
 
Installation 
Installation of the LXT-220 Controller involves: 
•  Unpacking the instrument 
•  Mounting 
•  Making Electrical Connections 
•  Configuring the Instrument 
•  Calibration 
2.1 Unpacking the Instrument 
The LXT-220 Controller has been carefully packaged to protect it 
from damage during shipment and dry storage.  Upon receipt please 
follow the procedure outlined below: 
1.  Before unpacking, inspect the condition of the shipping container 
to verify proper handling by the carrier. If damage is noted, save 
the shipping container as proof of mishandling for the carrier. 
2.  Check the contents of the shipping container with the items and 
quantities shown on the packing list.  Immediately report any 
discrepancies to TI/TAI. 
3.  Save the original packing material until you are satisfied with the 
contents.  In the event the transmitter must be returned to the 
factory, the packing material will allow you to properly ship it to 
TI/TAI. 
4.  Familiarize yourself with the instrument before installation, and 
follow proper installation and wiring procedures. 
2.2 Mounting 
Three typical installation configurations are available for the LXT-
220:  
•  Universal mounting plate