Grizzly G0756 Manuale Utente

Pagina di 64
Model G0756 (Mfg. Since 2/13)
-21-
Spindle break-In
Before subjecting the spindle to operational loads, 
it  is  essential  to  complete  the  break-in  process. 
this helps ensure maximum life of spindle bear-
ings  and  other  precision  components  by  thor-
oughly lubricating them before placing them under 
load. 
After spindle break-in is complete, we recommend 
changing  headstock  and  gearbox  oil  to  remove 
any metal particles or debris that are present from 
the assembly and break-in process. 
the  break-in  must  be  performed  in  succession 
with  the 
Test Run  procedure  described  in  this 
manual,  as  the  steps  in  that  procedure  prepare 
the drill press for the break-in process.
DO NOT perform this procedure indepen-
dently of the Test Run section. The drill 
press could be seriously damaged if the 
controls are set differently than instructed 
in that section.
To perform the spindle break-in procedure:
1
.   Move the drilling & tapping switch to the drill-
ing position (see 
figure 15).
figure 15. drilling/tapping switch.
drilling and 
tapping 
switch
2.  position  the  speed  control  levers  for  440 
rpM.
3.  press the spindle start button.
4.  Allow the machine to run for 10 minutes.
5.  press the spindle stop button.
6.  position  the  speed  control  levers  for  870 
rpM,  and  allow  machine  to  run  for  10  min-
utes.
7
.   press the oFF button, and adjust the speed 
control levers for 440 rpM.`
8.  press the spindle start button.
9.  press the button on the end of the downfeed 
handle to reverse spindle rotation.
10.  run the machine at 440 rpM and then 870 
rpM  for  10  minutes  each,  as  described 
above. 
 
11.  run the machine at 440 rpM for another 15 
minutes to allow it cool down.
spindle 
start Button
Congratulations! spindle break-in is complete. We 
recommend changing the headstock and gearbox 
oil before operating the machine further (refer to 
lubrication on 
Page 33).