Samsung A6 Manuale Utente

Pagina di 46
E-
44
Checking and Testing Operations
C
OMPLETING THE
I
NSTALLATION
To complete the installation, perform the following checks and tests
to ensure that the air conditioner is operating correctly.
1
Review all the following elements in the installation:
◆ Installation site strength
◆ Piping connection tightness to detect any gas leakages
◆ Connection wiring
◆ Heat-resistant insulation of the piping
◆ Drainage
◆ Earthing wire connection
◆ Correct operations (follow the steps below)
2
Press the On/Off button.
Result:
◆ The indicator lights on the indoor unit flash at               
half-second intervals.
◆ While the indoor unit opens, the indoor unit fan runs
to start. 
3
Press the            button.
Result:
The outdoor unit operates in cooling mode as 
following the room temperature.
4
Air flow direction 
Press the             button and check that the air
flow blades work properly.