ADT Security Services 200 Plus Manuale Utente

Pagina di 88
 
 
– 43 – 
System Programming (cont’d) 
4.  Press Daylight to display “Spring Daylight” description and programmed 
date. 
5.  Press  Previous or Next to toggle between “Spring Daylight” description 
and “Fall Daylight” description and the date you want to change. 
6.  Press Change to display the selector buttons for entering a new spring or 
fall description. 
7.  Press Continue to display current and new date entry field. 
8.  Using the operating panel’s numeric keypad, enter the new date. 
Example: April 9th is entered 0409. 
9.  Press Enter to complete your entry and display the new date.  
10. Press  Quit to display the previous screen. Repeat steps 5 to 9 for the 
second date. 
11. Press Quit to display the Time Selection Menu. 
Daily Operating Schedules 
Your FOCUS
 200 PLUS system can accommodate two distinct daily 
operating schedules (two opening times and two closing times) for each day 
of the week for each Burglary (BA) group. Daily operating schedules may be 
used to restrict access to the facility and/or system. Users who have not been 
assigned “open regular” privilege will be denied access (key or card access 
control) or will trip an irregular opening alarm if a BA group is turned off 
outside the schedules or on holidays. These schedules also enable your 
system to automatically alert the ADT Customer Monitoring Center if the 
burglary protection was turned on at the proper time. Your system can also 
accommodate schedule limits, which prevent schedule changes that are 
outside the schedule limits.