GSI Outdoors 2TF Manuale Utente

Pagina di 57
2000 Autoflow
15
Multi-Grain Temperature Sensor
1.
Remove the two wires attached to the grain tem-
perature sensor connected to terminal #22 and
terminal  #23 in the fan control box.
2. Mount the four grain temperature sensor brack-
ets evenly around the drying chamber on out
side leveling band posts (figure 5).
3. With bin bolts mount the bracket so the sensor is
10.1/2” above the floor sheet rib.
on all temperature sensor brackets to exit the dry
ing chamber at the same place.
6. Run the cords back into the fan control box.
7. Wire the four temperature sensors into terminal
#22  and terminal #23 as detailed in Figure 4 and
the close up detail on page 17.
Figure 4: Illustration of the connection between the master heater control box and multiple sensors in the
drying chamber.
INSTALLATION
band post, and across the top leveling band.
5. Take the cords through the space between the roof
and the top sidewall sheet. There should be enough
4. Wire tie the cords so they feed  up the leveling