Rinnai RHFE-1004FA Manuale Utente
DIMENSIONS
– 5 –
14 1/16" (357.5)
12 3/8" (315)
13" (330)
7 7/8" (200) 4 1/2" (115)
36 5/8" (930)
40 1/2" (1029)
26 3/8" (670)
15 5/8" (397)
11 13/16" (300)
GAS
CONNECTION
10 7/8"
(R277)
(R277)
9 13/16" (250)
6 1/2" (165)
6 5/16"(160)
13 3/4" (R350)
Cavity Opening
FLUE MANIFOLD POSITION
Center of hole for flue manifold can be drilled
anywhere within the shaded area. (To avoid
studs, etc.)
Center of hole for flue manifold can be drilled
anywhere within the shaded area. (To avoid
studs, etc.)
FOR WEATHERBOARD WALLS DRILL
THROUGH CENTER OF WEATHER BOARD
FROM OUTSIDE, THEN DRILL FROM
INSIDE THROUGH PLASTERBOARD.
THROUGH CENTER OF WEATHER BOARD
FROM OUTSIDE, THEN DRILL FROM
INSIDE THROUGH PLASTERBOARD.
Before drilling the flue hole, check for water
and gas pipes as well as electric cables. Use
a 3 1/8" (80mm) drill for hole through wall.
and gas pipes as well as electric cables. Use
a 3 1/8" (80mm) drill for hole through wall.
Flue Hole
3 1/8"
(80mm)
inches (mm)