Empire Products RB) Manuale Utente

Pagina di 20
Page 18 
  12425-7-0406  
Installing Blower Using Three-Prong Plug
  1.  Install furnace according to Installation Instructions and Owner's 
Manual. 
  2.  Refer to Drawing for measurements to locate (2) mounting holes 
on wall surface above furnace.
On Solid Wall
  3.  After locating mounting holes, attach (2) #10 x 1 1/2" screws provided 
in blower kit into wall. Do not completely tighten screwheads to 
wall, leave a 7/16" gap between screwheads and wall.
On Sheet Rock Wall
  3.  After locating mounting holes, drill (2) 5/16" diameter holes into 
wall. Insert the (2) plastic expansion anchors into holes. Insert  (2) 
#10 x 1 1/2" screws provided in blower kit into (2) plastic expansion 
anchors. Do not completely tighten screwhead to plastic expansion 
anchors, leave a 7/16" gap between screwheads and plastic expansion 
anchors. Refer to Figure 2.
  4.  At the top of outer casing remove (1) screw from center clearance 
hole that attaches outer casing to header assembly. Also, remove (2) 
screws that attach bottom of outer casing to inner casing. 
  5.  Pull the outer casing forward approximately 1 inch away from  wall 
surface.
  6.  Remove  (4)  8  x  3/8"  screws  that  attach  blower  front  to  blower 
housing.
Caution: When removing blower front be careful not to damage 
motor  coil  wires.  Damaged  coil  wires  will  disable  blower 
function. 
  7.  Position blower housing on top of header assembly and route three-
prong cord set between left side of outer casing and inner casing.
Caution: Blower cord set routing is important. Cord set should 
be in proper location to avoid being overheated. Incorrect routing 
of cord set may result in damage to cord set. 
  8.  Replace the outer casing to the wall surface.
  9.  Attach  outer  casing  to  header  assembly. 
Attention:  The  center 
clearance hole will not be used. The two outside clearance holes 
will be used to attach outer casing to header assembly, (1) screw 
from Step 4 and (1) screw supplied in hardware package. Refer to 
Figure 1.
Figure 1
 10.  Attach outer casing to inner casing with (2) screws from Step 4. 
 11.  Align key hole slots on back of blower housing with the (2) screws 
attached to wall. Position blower housing flush with wall surface 
and on top of outer casing. Complete tightening blower housing 
screws from Step 3 to wall.
12.  Attach caps and plugs from blower housing and blower front.
13.  Attach blower front to blower housing with (4) 8 x 3/8" screws from 
Step 6.
 14.  Installation of optional blower assembly is completed.
 
GWTB-2 FOR MODELS
GWT-25 (SG, RB), GWT-35 (SG, RB), GWT-50 (SG, RB)
OPTIONAL BLOWER INSTALLATION INSTRUCTIONS
Caution: When installing blower housing onto wall be careful motor 
coil is not damaged.
Installing Blower With Hard Wiring
  1.  When facing the wall opening, install 120V electrical outlet junction 
box inside wall opening on left wall stud approximately 12 inches 
above header plate.
  2.  Refer to Drawing for measurements to locate access hole for electrical 
wiring on wall surface.
  3.  After locating access hole, drill a 1/2" hole into wall.
  4.  Route enough field wiring from 120V electrical outlet junction box 
through 1/2" access hole in wall for connection to blower housing.
  5.  Install furnace according to Installation Instructions and Owner's 
Manual. 
  6.  Refer to Drawing for measurements to locate (2) mounting holes on 
wall surface above the furnace.
On Solid Wall
  7.  After locating mounting holes, attach (2) #10 x 1 1/2" screws provided 
in blower kit into wall. Do not completely tighten screwheads to 
wall, leave a 7/16" gap between screwheads and wall.
On Sheet Rock Wall
  7.  After locating mounting holes, drill (2) 5/16" diameter holes into  
wall. Insert  (2) plastic expansion anchors into holes. Insert (2) #10 
x 1 1/2" screws provided in blower kit into (2) plastic expansion 
anchors. Do not completely tighten screwhead to plastic expansion 
anchors, leave a 7/16" gap between screwheads and plastic expansion 
anchors. Refer to Figure 2.
Figure 2
  8.  Remove three prong cord set from blower housing.
  9.  Remove  (4)  8  x  3/8"  screws  that  attach  blower  front  to  blower 
housing.
 10.  Position blower housing on top of header assembly. 
 11.  Route 120V field wiring into blower housing through cord set hole 
on back of blower housing.
 12.  Refer to wiring diagram to make wiring connections inside blower 
housing. Be sure to follow all local and National electrical codes 
when making field wiring connections.
13.  Align key hole slots on back of blower housing with (2) screws 
attached to wall. Position blower housing flush with wall surface and 
on top of outer casing. Complete tightening blower housing screws 
from Step 7 to wall.
14.  Attach caps and plugs from blower housing and blower front.
15.  Attach blower front to blower housing with  (4) 8 x 3/8" screws from 
Step 9.
 16.  Installation of optional blower assembly is completed.