FIELD CONTROLS 24v Manuale Utente

Pagina di 12
11
UV-AIRE
®
Air Purification System
Installation Options
Installation
ALWAYS wear protective goggles to shield your eyes from UV
damage when installing the UV-Aire.
UV-C can break down plastic material that is not UV
resistant. Based on lab tests, positioning the lamp 30 inches
or more away from plastic surfaces such as flex duct, drain
pans, etc. will prevent any measurable break down.
1.  Insert the unit downstream from an A-coil in the
supply plenum or downstream from the air filter in
the return plenum.
Mount base on duct
using the enclosed
mounting screws.
2.  Insert lamp through
hole. Place bracket
over end of tube and
tighten wing nut.
3.  Replace cover on unit
and tighten 
side screw.
4. Plug into 120V outlet
& place rocker switch in “ON” position.
5. Switch will illuminate & blue glow can be seen
through view port when unit is operating properly.
Optional
Location
Best 
Location
Return Air 
Plenum
Supply Air
Plenum
A-Coil
The UV-Aire can be installed in ducts nine
inches and larger. Each unit comes with a
duct board mounting kit and a patent-
pending angle bracket. A dual lamp model
is available for commercial applications
and/or increased potency. There is also a
model designed specifically for heat pumps
and a model for outdoor installations.
Good: Standard Installation
Better: Patented Angled Installation - 
Single Lamp 
Best: Two Angled Lamps or
Two Lamps Perpendicular
Note: When multiple lamps are
used, spacing between lamps
should be at least four inches.
Angle option allows longer
lamps to fit in smaller ducts. 
12"
18"
18"
18"
18"
Good
Better
Best
18"
16"
Duct
20"
Duct
16"
Duct
16"
Duct