Sears 139.18847 Manuale Utente
![Sears](https://files.manualsbrain.com/attachments/3d0ee5d406904e6a00baabce3f1dc16ec215d557/common/fit/150/50/dd902ecb335226831110b6942529e28cf375d0eb73159515512c0302c2c9/brand_logo.png)
Header
Bracket
Cable
Pulley
Bracket
Temporary
Support
Header Wall
Garage
Door
The Chamberlain Group, Inc.
Attach Tee Rail to Header Bracket
2/4/92 - 4/9/92
Attach Tee Rail to Header Bracket
2/4/92 - 4/9/92
T-rail
Clevis Pin
5/16"x2-3/4"
Ring Fastener
Header Bracket
Cable
Pulley
Bracket
T-rail
• Position the opener on the garage floor below the
header bracket. Use packing material as a
protective base.
protective base.
If the door spring is in the way you'll need help.
Have someone hold the opener securely on a
temporary support to allow the T-rail to clear the
spring.
Have someone hold the opener securely on a
temporary support to allow the T-rail to clear the
spring.
• Position the cable pulley bracket against the header
bracket.
• Align the bracket holes and join with a clevis pin as
shown.
• Insert a ring fastener to secure.
15
Installation Step 3
Attach the T-rail to the Header Bracket
Clevis Pin
5/16"x2-3/4"
Ring Fastener
Axe de chape de 5/16 de pox2-3/4 po
Anneau d'arrêt
Hardware Shown Actual Size