Dometic 2597 Manuale Utente

Pagina di 20
ENGLISH
3
Battery-Powered Systems Installation Guidelines
CONTENTS
NOTES AND WARNINGS 
4
INSTALLING ThE BATTERIES 
5
INSTALLING ADDITIONAL BATTERY BOXES 
6
WIRING ThE NEW BATTERIES 
6
INSTALLING ThE BATTERY FUEL GAUGE 
7
INSTALLING ThE INVERTER 
7
OPTIONAL: INSTALLING ThE INVERTER/ChARGER 
7
INSTALLING ThE INVERTER CONTROLS 
8
INSTALLING ThE ALTERNATOR 
9
INSTALLING ThE REGULATOR 
10 – 11
TESTING ThE ALTERNATOR 
12
WIRING ThE 120VAC POWER TO ThE hVAC UNIT 
12
OPTIONAL: INSTALLING 120VAC OUTLETS INSIDE ThE SLEEPER 
13
OPTIONAL: INSTALLING ShOREPOWER CONNECTION 
13
WIRING DIAGRAMS FOR BATTERY CONNECTION CONFIGURATIONS 
14 – 19