Toshiba HV6CS-MLD Istruzione Sull'Installazione

Pagina di 38
 
 
- 13 - 
 
3. Installation 
Make sure the location satisfied the requirements listed under Storage and Installation 
Location   (page 3) and check the dimensions using the diagrams in other catalogs or external 
view diagrams and panel cut diagram. Prior to installation, the maximum fault current capacity 
of the power system at the point of installation should be verified. This value must not exceed 
the symmetrical interrupting capability of the circuit breaker. See typical circuit breaker 
nameplate below. 
 
Do not exceed the ratings specified on the breaker nameplate or 
system accessories. Underrated equipment can fail during operation 
causing fire, explosion, severe injury, death, and property damage. 
 
 
 
 
     
     Typical Circuit Breaker Nameplate 
3.1 Mounting the Drawout Cell 
3.1.1 Mounting in the panel 
To install the draw-out unit, perform the steps shown in Figures 4 and 5 in that order. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 4 Fasten the drawout cell to the panel with 
the 4 hexagonal bolts (M8). Tightening torque 
should be 11.8 to 14.7 N-m (120 to 150 kgf-cm).
 
Figure 5 Crimp the crimp-on terminal 
provided with the unit to the grounding wire 
and use the hexagonal bolt (M8) to fasten it 
in place. The tightening torque should be 
11.8 to 14.7 N-m (120 to 150 kgf -cm). 
       
DANGER