Lochinvar SNA285-125 Manuale Utente

Pagina di 76
57
11  
Maintenance
Maintenance and annual startup
Table 11A Service and Maintenance Schedules
Service technician
(see the following pages for instructions)
General:
 
• Address reported problems
  • Inspect interior; clean and vacuum if 
  
necessary; 
 
• Clean condensate trap and fill with fresh 
  
water
 
 Check for leaks (water, gas, flue, 
  
condensate)
 
• Verify flue and air lines in good condition 
 
  and sealed tight
 
• Check system water pressure/system 
  
piping/expansion 
tank
 
• Check control settings
 
•  Check ignition and flame sense electrodes      
  (sand off any deposits; clean and 
       reposition)
 
• Check wiring and connections
 
 Perform start-up checkout and 
   performance verification per Section 9 
 
  in this manual.
 
• Flame inspection (stable, uniform)
 
• Flame signal (at least 10 microamps at 
 
   high fire)
 
 Clean the heat exchanger if flue 
   temperature is more than 54°F above 
 
  return water temperature.
 
• Check anode rods.
 
• Check Delta T (Temperature Rise)
If combustion or performance 
indicate need:
 
 • Clean heat exchanger
 
 •
 Remove and clean burner using 
 
   compressed air only 
 
 • Clean the blower wheel 
ANNUAL START-UP
Owner maintenance
Daily
 
•  Check water heater area 
Monthly
 
• Check vent piping
 
• Check air piping
 
• Check relief valve
 
• Check condensate drain system
 
• Check Delta T (Temperature Rise)
Every
6 months
 
 
 
      • 
 
Check water heater piping 
        (gas and water) for leaks
 
• Operate relief valve
       
Installation & Service Manual
TM