5. TOP DOWN™ TD-SERIES
PIPING INSTALLATION
DOMESTIC WATER PIPING
1.  Connect the cold water supply to the pipe labeled COLD 
WATER
2.  Connect the HOT WATER piping to the domestic hot water 
system.
3.  Make an 8-inch “heat trap” on the HOT WATER outlet as 
shown in the diagram. This will reduce standby losses from 
heat migrating up the piping.
4.  When all domestic water piping is complete, open the cold 
water supply and allow some water to enter the tank.  Look 
and listen for signs of leaks and repair as necessary before 
continuing.
Note:  If  installing  on  a  city  supply,  ensure  a  dedicated 
Thermal  Expansion  tank  (Therm-X-Trol
®
  or  equivalent)  is 
used.
5.  Install  a  blowdown  tube  on  the  T&P  relief  valve  outlet.  
Plumb to within 6 inches above a floor drain or as directed 
by plumbing code.
BOILER PIPING
1.  Plumb the circulator or zone valve on the BOILER SUPPLY 
line.    If  using  a  separate  circulator,  the  pump  flange 
can  be  mounted  directly  to  the  threaded  pipe  marked 
BOILER SUPPLY.  Alternately, the circulator can be placed 
anywhere on the boiler supply line.
2.  Pipe the BOILER RETURN connection to the boiler return 
line.
Be  sure  the  return  line  is  NOT 
plumbed to the suction side of any 
heating  circulators.    This  may  require  moving  the 
heating circulator off the boiler tapping on packaged 
boilers.  Failure to do so will result in overheating and 
tank  damage  when  the  heating  system  is  in 
operation.
3.  Install a weighted flow check on the boiler return line.  This 
is not necessary on systems utilizing a zone valve to control 
the BoilerMate
®
 temperature.
4. After completing the boiler piping, slowly open the boiler fill 
valve and pressurize the BoilerMate
®
 loop.  Check for leaks 
and repair as necessary. Proceed to the appropriate wiring 
section in this manual.
If  installing  on  city  water  supply  a 
properly  sized  THERM-X-TROL
®
  is 
required  with  the  BoilerMate
®
  and  should  be  installed  as  set 
forth in the THERM-X-TROL
®
 product installation manual.
LEFT SIDE  . . . . . . . . . . . . 1”
RIGHT SIDE . . . . . . . . . . . 1”
TOP  . . . . . . . . . . . . . . . . . 9”
REAR  . . . . . . . . . . . . . . . . 1”
FLOOR . . . . . . . . . . . . . . . 0”
FRONT . . . . . . . . . . . . . . . 1”
Clearance From Combustible Surfaces
LEFT . . . . . . . . . . . . . . . . . 12”
RIGHT. . . . . . . . . . . . . . . . 12”
FRONT . . . . . . . . . . . . . . . 30”
HEAD ROOM . . . . . . . . . . 9”
REAR  . . . . . . . . . . . . . . . . 1”
Recommended Clearance For Servicing
T&P RELIEF VALVE OUTLET
HOT WATER OUTLET
BOILER RETURN
(Bottom Left)
BOILER SUPPLY
(Bottom Right)
COLD WATER INLET
(Top Center)
DRAIN VALVE