American Water Heater AHCG3/HCG3100T250 Manuale Utente

Pagina di 40
12
Propane Installation Code which requires the vent system components 
be certified to ULC S636.
This water heater has been design certified to be vented with PVC pipe 
certified  and  marked  as  complying  with  ULC  S636. This  water  heater  is 
supplied with a 2 inch 22.5 degree termination elbow that is a special fitting 
that must be used with the appliance. Any outlet piping, fittings and glue used 
to vent this appliance that is not supplied by the manufacturer must comply 
with the ULC S636 requirements. 
PVC Materials should use ASTM D-2564 Grade Cement; CPVC Materials 
should use ASTM F-493 Grade Cement and ABS Materials should use ASTM 
D-2235 Grade Cement.
If the water heater is being installed as a replacement for an existing power 
vented heater in pre-existing venting, a thorough inspection of existing venting 
system must be performed prior to any installation work. Verify that correct 
material as detailed above has been used, and that the minimum or maximum 
vent lengths and terminal location as detailed in this manual have been met. 
Carefully inspect the entire venting system for any signs of cracks or fractures, 
particularly at joints between elbows and other fittings and straight runs of 
vent pipe. Check system for signs of sagging or other stresses in joints as 
a result of misalignment of any components in the system. If any of these 
conditions are found, they must be corrected in accordance with the venting 
instructions in this manual before completing installation and putting the water 
heater into service.
NOTE:  for Water Heaters in locations with high ambient temperatures (above 
100°F or 38°C) and/or insufficient dilution air, it is recommended that CPVC or 
ABS pipe and fittings (MUST USE SUPPLIED VENT TERMINAL) be used.
NOTE:  Stress levels in the pipe and fittings can be significantly increased by 
improper installation. If rigid pipe clamps are used to hold the pipe in place, 
or if the pipe cannot move freely through a wall penetration, the pipe may 
be directly stressed, or high thermal stresses may be formed when the pipe 
heats up and expands. Install accordingly to minimize such stresses.
VENT PIPE PREPARATION
1.  INITIAL PREPARATION
 
  A. Make sure the solvent cement you are planning to use is designed  
  for the specific application you are attempting.
  B. Know  the  physical  and  chemical  characteristics  and  limitations  of  
  the PVC, PVC cellular core, ABS or CPVC piping materials that you  
  are about to use.
  C. Know  the  reputation  of  your  pipe  and  cement  manufacturer  and 
  their products.
  D. Know your own qualifications or those of your contractor. The solvent 
  welding technique of joining PVC, PVC cellular core, ABS or CPVC 
  pipe is a specialized skill just as any other pipe fitting technique.
 
  E. Closely supervise the installation and inspect the finished job before  
  start-up.
 
  F.  Contact the manufacturer, supplier, or competent consulting agency  
  if  you  have  any  questions  about  the  application  or  installation  of  
  PVC, PVC cellular core, ABS or CPVC pipe.
 
  G. Take the time and effort to do a professional job. Shortcuts will only  
  cause you problems and delays in start-up. The majority of failures  
  in these systems are the result of shortcuts and/or improper joining  
  techniques.
2. SELECTION OF MATERIALS
PRIMER
It is recommended that Tetrahydrofuran (THF) be used to prepare the surfaces 
of pipe and fittings for solvent welding. Do not use water, rags, gasoline or 
any other substitutes for cleaning PVC cellular core, ABS or CPVC surfaces. 
A chemical cleaner such as MEK may be used.
INSTALLATION OF VENT SYSTEM
 WARNING
THE OPTIONAL INTAKE VENTING ARRANGEMENT AND THE EXHAUST 
VENTING ARRANGEMENT MUST BE INSTALLED TO RUN DIRECTLY TO 
THE OUTDOORS AND NOT IN ANY WAY BE CONNECTED TO ANOTHER 
VENTING SYSTEM (I.E. FURNACE, DRYERS OR SPACE HEATERS). IT 
IS CRUCIAL THAT THE VENTING ARRANGEMENT BE KEPT SEPARATE 
FROM OTHER VENTING SYSTEMS. IF THIS WARNING IS IGNORED, AND 
THE SYSTEM IS VENTED INCORRECTLY, IT MAY CAUSE IMPROPER 
OPERATION, FIRE, EXPLOSION, OR ASPHYXIATION
.
1.  Plan the route of the vent system from the vent termination to the planned 
location of the appliance. Layout the total vent system to use the minimum 
of vent pipe and elbows possible.
2.  The installer may add up to a MAXIMUM OF FIFTY (50) EQUIVALENT 
FEET (15.2 m) of pipe to the exhaust venting arrangement. This addition 
of FIFTY (50) EQUIVALENT FEET (15.2 m) of pipe on both the intake 
venting arrangement and exhaust venting arrangement must include any 
3" PVC elbows which equals (5) EQUIVALENT FEET (1.5 m) of pipe.
3.  It is important that condensate not be allowed to buildup in the exhaust 
vent pipe. To prevent this from happening the pipe should be installed with 
a slight, 1/8" (3mm) per 5' (152 cm) of pipe maximum downward slope.
4.  The vent system should be supported every 5' (152 cm) of vertical run 
and every 3' (91cm) of horizontal run of vent pipe length.
Table 2.  VENT LENGTH TABLE
  Number 
3"  
3"  
        4" 
 
of 90° 
Minimum 
Maximum 
Maximum
  Elbows 
Pipe (Ft./M.) 
Pipe (Ft./M.)  
Pipe (Ft./M.)
 
ONE (1) 
7/2 
45/13.7 
115/35
 
TWO (2) 
7/2 
40/12.2 
110/33.5
  THREE (3) 
7/2 
35/10.7 
105/32
 
FOUR (4) 
7/2 
30/9.1 
100/30.5
  FIVE (5) 
7/2 
--- 
     95/29
 
SIX (6) 
7/2 
--- 
    90/27.4
4" PVC may be used for a MAXIMUM intake of ONE HUNDRED TWENTY 
(120)  EQUIVALENT  FEET  (36.6m)  and  a  MAXIMUM  exhaust  of  ONE 
HUNDRED TWENTY (120) EQUIVALENT FEET  (36.6m).  The maximum 
number of 90° elbows with the 4" venting is six (6) on the intake and six (6) 
on the exhaust.  A 90° elbow is equal to five (5) equivalent feet (1.5m) of pipe.  
One (1) 90° elbow  is equal to  two (2) 45° elbows.  Any venting configuration 
using less than 50 equivalent feet should use 3" venting. See Table 2.
The  3"  venting  terminals  (provided)  must  be  used  with  the  
3" vent pipe. Two, approved 4" vent terminals (not provided) must be used 
with 4" vent pipe. See replacement parts list for terminals.
IMPORTANT
When multiple units are direct vented through a wall (3" or 4" venting), all intake 
vent terminals should be no lower than the highest exhaust vent terminal.
U.S. INSTALLATIONS
NOTE:  This unit can be vented using only PVC (Class 160, ASTM D-2241 
Schedule 40, ASTM D-1785 ; or Cellular Core Schedule 40 DWV, ASTM  
F-891) , Schedule 40 CPVC (ASTM F-411), or ABS (ASTM D-2661) pipe. 
The fittings, other than the TERMINATIONS should be equivalent to PVC-
DWV fittings meeting ASTM D-2665 (Use CPVC fittings, ASTM F-438 for 
CPVC pipe and ABS fittings, ASTM D-2661/3311 for ABS pipe. If CPVC or 
ABS pipe and fittings are used, then the proper cement must be used for 
all joints, including joining the pipe to the Termination  (PVC Material). PVC 
Materials should use ASTM D-2564 Grade Cement; CPVC Materials should 
use ASTM F-493 Grade Cement and ; ABS Materials should use ASTM  
D-2235 Grade Cement. 
CANADIAN INSTALLATIONS
This water heater must comply with CAN/CSA B149.1 - Natural Gas and