American Water Heater American Water Heaters Residential Gas Water Heater Manuale Utente

Pagina di 40
23
InstallatIon of vent sYsteM, sIdewall
With the route of the venting system and selection of materials completed, 
as discussed in the section of this manual titled PLANNING THE VENT 
SYSTEM, the through the wall vent terminal in place and the first section
of piping, up to first elbow, installed at the blower it is time to complete the
installation of the venting system for the sidewall installation.
fIGure 20
It is recommended that the completion of the venting system start 
at the blower assembly and run to the coupling on the inside wall 
of the vent terminal, Figure18.
The vent system piping should be supported every 5 feet (1.5 m) 
of vertical run and every 3 feet (91 cm) of horizontal run. Follow vent
pipe manufacturer’s instructions for proper joining procedures.
If  necessary  to  achieve  the  12”  minimum  clearance  above
the highest anticipated snow level, install a snorkel as shown 
in bottom portion of Figure 20.
note:  With the installation of a snorkel it is necessary to 
use two 90° elbows that shall be considered along with the
additional vent pipe when calculating maximum equivalent 
feet of venting.
InstallatIon of vertIcal vent sYsteM
A  proper  flashing  or  “BOOT”  should  be  used  to  seal  the
pipe where it exits the roof. The total vent system should 
not exceed the  equivalent feet of pipe as listed in Table 2.
Provide support for all pipe protruding through the roof. All piping should 
be properly secured. The vent system piping should be supported  
every 5 feet (1.5 m) of vertical run and every 3 feet (91 cm) of
horizontal run. Follow vent pipe manufacturer’s instructions for proper  
joining procedures.
fIGure 21
IMportant
The vent system must terminate so that proper clearances 
are maintained as cited in local codes or the current edition 
of the National Fuel Gas Code (ANSI Z223.1) or the Natural
Gas and Propane Installation Code (CAN/CSA-B149.1) and as  
listed below:
1.  Vent Termination must extend a minimum of 12 inches (30 cm)
above roof or 12 inches (30 cm) above the anticipated snow level
to prevent blockage of the vent termination, as shown in Figures 
20 and 21.