American Water Heater American Water Heaters Residential Gas Water Heater Manuale Utente

Pagina di 40
5
thank You for purchasing this water heater.  Properly installed and 
maintained, it should give you years of trouble free service.
Abbreviations Found In This Instruction Manual:
•  CSA - Canadian Standards Association
•  ANSI - American National Standards Institute
•  NFPA - National Fire Protection Association
•  ASME - American Society of Mechanical Engineers
•  AHRI - Air Conditioning, Heating and Refrigeration Institute
•  UL - Underwriters Laboratories Inc.
This  gas-fired  water  heater  is  design  certified  by  Underwriters
Laboratories Inc. under American National Standard/CSA Standard 
for Gas Water Heaters ANSI Z21.10.3 • CSA 4.3 (current edition).
qualIfIed Installer or servIce aGencY
Installation and service of this water heater requires ability equivalent 
to that of a Qualified Agency (as defined by ANSI below) in the field
involved. Installation skills such as plumbing, air supply, venting, 
gas supply and electrical supply are required in addition to electrical 
testing skills when performing service.
ansI Z223.1 2006 sec. 3.3.83: “Qualified Agency” - “Any individual,
firm,  corporation  or  company  that  either  in  person  or  through  a
representative is engaged in and is responsible for (a) the installation,
testing or replacement of gas piping or (b) the connection, installation,
testing, repair or servicing of appliances and equipment; that is 
experienced in such work; that is familiar with all precautions required; 
and that has complied with all the requirements of the authority 
having jurisdiction.”
If you are not qualified (as defined by ANSI above) and licensed or
certified as required by authority having jurisdiction to perform a given
task do not attempt to perform any of the procedures described in this 
manual. If you do not understand the instructions given in this manual 
do not attempt to perform any procedures outlined in this manual. 
preparInG for the InstallatIon
1.  Read “General Safety Information” section, page 3 and 4 of this manual
first and then entire manual carefully. If you don’t follow safety rules,
the water heater will not operate properly. It could cause DEATH, 
SERIOUS BODILY INJURY AND/OR PROPERTY DAMAGE.
  This manual contains instructions for installation, operation, 
and maintenance of the gas-fired water heater. It also contains
warnings throughout the manual that you must read and be 
aware of. All warnings and all instructions are essential to proper 
operation of the water heater and your safety. Since we cannot 
put everything on the first few pages,
read entIre Manual 
Before atteMptInG to Install or operate the 
water heater.
2.  The installation must conform with these instructions and local 
code authority having jurisdiction. In absence of local codes, 
installation must comply with current editions of the National Fuel 
Gas Code, ANSI Z223.1/NFPA 54 and National Electrical Code, 
NFPA 70. All documents are available from Canadian Standards 
Association, 8501 East Pleasant Valley Road, Cleveland, OH 
44131. NFPA documents are also available from National Fire 
Protection Association, 1 Batterymarch Park, Quincy, MA 02269.
3.  The water heater when installed must be grounded in accordance 
with the local codes, or in the absence of local codes: the National 
Electrical Code (NFPA 70).
4.  If after reading this manual you have any questions or do not 
understand any portion of the instructions, call the local gas utility or 
the manufacturer whose name appears on the rating plate.
5.  Carefully plan the place where you are going to put the water heater.  
Correct combustion, vent action, and vent pipe installation are 
very important in preventing death from possible carbon monoxide 
poisoning and fires, see Figures 1 and 2.
  Examine the location to ensure the water heater complies with the 
“Locating the New Water Heater” section in this manual.
6.  For California installation this water heater must be braced, 
anchored, or strapped to avoid falling or moving during an 
earthquake. See instructions for correct installation procedures. 
Instructions may be obtained from California Office of the State
Architect, 400 P Street, Sacramento, CA 95814.
7.  Massachusetts Code requires this water heater to be installed in 
accordance with Massachusetts 248-CMR 2.00: State Plumbing 
Code and 248-CMR 5.00.
8.  Complies with SCAQMD rule #1146 and districts having equivalent 
NOx requirements.
IntroductIon
taBle of contents
SAFE INSTALLATION, USE AND SERVICE................................................2
APPROVALS ................................................................................................2
GENERAL SAFETY INFORMATION .........................................................3-4
TABLE OF CONTENTS ................................................................................5
INTRODUCTION ..........................................................................................5
Qualified Installer or Service Agency ...................................................5
 
Preparing for the Installation ................................................................5
INSTALLATION  REQUIREMENTS  FOR  THE COMMONWEALTH
OF MASSACHUSETTS ................................................................................6
TYPICAL INSTALLATION ..........................................................................7-9
 
Mixing Valves .......................................................................................9
LOCATING THE NEW WATER HEATER ..............................................10-13
 
Facts to Consider About Location ................................................. 10-11
 
Insulation Blankets ............................................................................. 11
 
Air Requirements ..........................................................................11-12
Unconfined Space .............................................................................12
Confined Space .................................................................................12
Fresh Air Openings for Confined Spaces ..........................................12
 
Outdoor Air Through Two Openings ..................................................12
 
Outdoor Air Through One Opening ...............................................12-13
 
Outdoor Air Through Two Horizontal Ducts .......................................13
 
Outdoor Air Through Two Vertical Ducts ............................................13
 
Air from Other Indoor Spaces ............................................................13
INSTALLING THE NEW WATER HEATER ...........................................14-27
 
Chemical Vapor Corrosion .................................................................14
 
Water Piping ......................................................................................14
 
Space Heating & Potable Water System ...........................................14
 
Closed Water Systems ......................................................................14
 
Thermal Expansion ............................................................................15
 
Temperature-Pressure Relief Valve ..............................................15-16
 
High Altitude Installation ....................................................................16
 
Gas Piping ....................................................................................16-17
 
Sediment Traps ..................................................................................17
 
Filling the Water Heater ................................................................17-18
 
Vent Pipe Assembly ...........................................................................18
 Venting ...............................................................................................18
 
Vent Pipe Termination ........................................................................19
 
Planning the Vent System ..................................................................20
 Condensate ..................................................................................20-21
 
Blower Assembly Installation .............................................................21
 
Installation of Vent System ................................................................21
 
Vent Terminal Installation, Sidewall ...............................................21-22
 
Installation of Vent System, Sidewall .................................................23
 
Installation of Vertical Vent System ....................................................23
 
Vent Attenuation Assembly Installation Instructions ......................24-25
 
Vent Pipe Preparation ...................................................................26-27
LIGHTING & OPERATING LABEL .............................................................28
TEMPERATURE REGULATION ................................................................29
FOR YOUR INFORMATION .......................................................................30
 
Start Up Conditions ............................................................................30
 
Operational Conditions ......................................................................30
PERIODIC MAINTENANCE ..................................................................30-33
 
Venting System Inspection ................................................................30
 
Burner Operation and Inspection .......................................................31
 
Burner Cleaning .................................................................................31
 Housekeeping ....................................................................................31
 
Anode Rod Inspection .......................................................................31
 
Temperature-Pressure Relief Valve Test ............................................32
 
Draining and Flushing ........................................................................32
 Service ...............................................................................................33
LEAKAGE CHECKPOINTS ........................................................................33
REPAIR PARTS LIST .................................................................................34
TROUBLESHOOTING GUIDELINES ....................................................35-37
NOTES .......................................................................................................38
LIMITED WARRANTY ................................................................................39