Aiko CTH3-150 Manuale Utente

Pagina di 82
CTH3-S
ERIES
 I
NSTALLATION
, O
PERATION
 
AND
 S
ERVICE
 M
ANUAL
22 of 71
SECTION 7: OPTIONAL HEATER ACCESSORIES
7.1 U-Tube Configuration
Heaters are approved for optional U-Tube 
configurations. 
The U-Tube may be installed in either a standard 
horizontal position, a 45° position or in an opposite 
45° position as shown 
Figure 9. When using a U-Tube configuration, the 
following additional rules must be adhered to:
• A minimum of 10' (3 m) on CTH3-80 and a mini-
mum of 15' (4.5 m) on CTH3-115/150/200 is 
required between the burner and the U-Tube.
• The correct turbulator (
must be installed in the last standard section of 
tube.
• The burner must never be operated in a tilted 
position.
• The heater must be properly supported at all loca-
tions. 
WARNING
Cut/Pinch Hazard
Wear protective gear during installation, 
operation and service.
Edges are sharp.
Failure to follow these instructions can result 
in injury.