Lucent Technologies Release 7 Manuale Utente

Pagina di 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-1727
TDM-CLK (TDM Bus Clock) 
9
Notes:
a. Refer to XXX-BD (Common Port Circuit Pack) Maintenance documentation 
for descriptions of these tests.
b. Refer to TONE-BD (Tone-Clock Circuit Pack) documentation for a 
description of this test.
c. Refer to TONE-PT (Tone Generator) documentation for descriptions of 
these tests.
d. This test only runs on the Standby Tone-Clock circuit pack in a Port 
Network with more than one Tone-Clock circuit pack (High or Critical 
Reliability Option). The circuit pack must be a TN780 code with firmware 
revision 2 or above, or be a TN2182.
e. Test #149 is not run on the TN2182.
TDM Bus Clock Circuit Status Inquiry Test (#148)
The TDM Bus Clock circuitry is checked for sanity. Any problems that are found 
are reported via error codes
TDM Bus Clock Parameter Update Test 
(#151)
X
X
ND
Board Type Check Test (#574)
X
X
ND
Standby Reference Health Check Test 
(#651) (d)
X
ND
1.
D = Destructive; ND = Nondestructive
Table 9-646.
TEST #148 TDM Bus Clock Circuit Status 
Inquiry Test 
Error 
Code
Test 
Result
Description/ Recommendation
None 
1001
ABORT
The system could not allocate the necessary resources for the test.
1. Wait 1-minute, and retry the test.
2000
ABORT
Response to the test was not received within the allowable time period.
2100
ABORT
System resources required to run this test are not available.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
Reset Board 
Sequence
D/ND
1