Lucent Technologies Release 7 Manuale Utente
DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-6
AC-POWER
9
Table 9-2. TEST #78 Power Query Test
Error Code
Test
Result
Description/Recommendation
1000
ABORT
System resources required to run test are not available.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
100
2000
2000
ABORT
Response to the test request was not received within the allowable time
period.
period.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
2. If the test continues to ABORT with error code 2000, check for
system powering problems with the A carrier (PPN or EPN). Resolve
all AC-POWER and CARR-POW alarms. Then, repeat the test.
all AC-POWER and CARR-POW alarms. Then, repeat the test.
3. If the test continues to ABORT with a 2000 error code, check for and
resolve all SYSAM errors in a PPN or MAINT errors (EPN
maintenance circuit pack) in an EPN. Then, repeat the test.
maintenance circuit pack) in an EPN. Then, repeat the test.
2029 2319
2320 2500
2320 2500
ABORT
Internal system error
1
FAIL
NOTE:
For a J58890CE, skip to step 2.
1. Procedures for a Global MCC (J58890CH):
a. For a nominal holdover system if there is no AC power at the wall
outlet, have a qualified electrician restore power to the outlet.
Power should range from 170 to 264 VAC.
Power should range from 170 to 264 VAC.
b. If there is AC power at the wall outlet, then there could be a
problem with the RM0850 Rectifiers, BU3200A Battery Interface
Unit (BIU), or battery. Resolve all alarms logged against the
POWER maintenance object, and rerun the test. If the test still
fails, the BIU may be defective. Check the BIU. If the BOD alarm
LED is on, replace the BIU.
If the BOD LED is off and the BOK LED is on, then the SYSAM or
the EPN maintenance circuit pack may be incorrectly reporting
the problem. Resolve all alarms against these MOs and rerun
the test.
Unit (BIU), or battery. Resolve all alarms logged against the
POWER maintenance object, and rerun the test. If the test still
fails, the BIU may be defective. Check the BIU. If the BOD alarm
LED is on, replace the BIU.
If the BOD LED is off and the BOK LED is on, then the SYSAM or
the EPN maintenance circuit pack may be incorrectly reporting
the problem. Resolve all alarms against these MOs and rerun
the test.