Lucent Technologies Release 6 Manuale Utente
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets
Installation and Test for Multi-Carrier Cabinets
555-230-112
Issue 5
May 1998
Cable Ductwork
Page C-13
C
Figure C-8.
Install Cross-Aisle I/O Ductwork or I/O Cross-Aisle to Wall
Trough
NOTE
:
If wall trough is being installed, locally provided hardware is required at wall
end of duct.
end of duct.
Figure Notes
1. I/O Trough
2. Use Only When Required
3. Cross-Aisle Brackets
4. I/O Endplate
5. Cross-Aisle I/O Trough or I/O Wall Trough
6. Front of Cabinet
duct3 KLC 071796