Little Wonder 2/1/1960 Manuale Utente

Pagina di 16
9
LITTLE 
WONDER
BLOWER
SET-UP INSTRUCTIONS
SET-UP INSTRUCTIONS
1.   Open box.  Remove upper handle and cardboard 
insert.
2.   Lay box down with blower housing up.  Use lower 
handle to roll unit out of the box.
3.   Locate hardware package.
4.   Install upper handle to lower handle with (4) 3/8-16 
x 1-3/4 carriage bolts and (4) 3/8-16 flanged nylon 
insert nuts from the hardware package.  Tighten the 
nuts securely but not so much as to crush the tube. 
(Figure 1)
5.  
If equipped with a Throttle Cable:  Route the 
throttle cable in front of lower handle crossbar.  
Install to the left side of the upper handle with (2) 
10-32 x ½ thread forming screws from the hardware 
package. (Figure 2)
6.  
 If equipped with a Throttle Cable: Secure the 
throttle cables to the handle tubes with cable ties 
from the hardware package.  Trim off excess.  
(Figure 3)
7.   Fill the engine with oil to the level indicated on the 
dipstick.  Fill the fuel tank with clean, fresh regular 
grade unleaded gasoline.
FIGURE 1
FIGURE 2
FIGURE 3