Servis-Rhino 1485 Manuale Utente

Pagina di 104
OPERATION
1480/1485/1495   01/11
Operation Section 4-32
© 2011 Alamo Group Inc.
OPERA
T
ION
BACKFILLING
Approach pile with a level bucket.
Poor methods actually move no more dirt and
make it more difficult to hold a level grade.
Do not use bucket in dumped position for
bulldozing. This method, shown above, will
impose severe shock loadings on dump linkage,
bucket cylinder and tractor.