Dimension One Spas Bay Collection Manuale Utente

Pagina di 72
2004 Bay Collection 
Owner’s Manual 
 
Initial Startup  
1.  Locate the Top Side Control.  
 
2.  Locate the hose bib that is included in the owner’s manual packet. The owner’s 
manual packet is shipped inside the equipment compartment. Your dealer should 
provide you with this packet during installation. 
3.  Locate the male fitting at the bottom of the lower left corner of the hot 
tub – below the skirt on the left corner of the side containing the Top 
Side Control. 
 
4.  Close the valve on the side of the hose bib and screw it onto the end of 
the hose bib. Check to ensure the cap on the hose bib is secure to avoid 
leaks when you add water to the spa. 
 
5.  Remove the panels below the Top Side Control and the right side to expose the pumps and the 
Lower Equipment Compartment. 
 
6.  There are two pump unions and two gate valves per 
pump. The pump on the left in the picture shows the 
typical locations of the Sarena Bay® pump unions and gate 
valves. (The Lotus Bay
 pumps are located behind the corner 
panel to the left of the Top Side Control.) Check to make 
sure the pump unions are hand tight to prevent the 
possibility of leakage. Next, check the gate valves to make 
sure they are fully opened and that the red safety clips are 
snapped into place. The other pumps in the picture are 
identified by the additional circles. Be sure to check pump 
unions and gate valves on all three pumps. 
 
7.  After you finish checking the pump unions and gate valves, remove the shipping bolts from the base 
of each pump and rotate the swivel lock, located at the rear of each pump, away from the pump.  
 
55