MRV Communications TS5000/4U1/V*) Manuale Utente
M R V C o m m u n i c a t i o n s , I n c . – I n s t a l l a t i o n M a n u a l
vi
Introduction
CAREFULLY READ THE ENTIRE
MANUAL BEFORE INSTALLING
n InfraRed (IR) link allows connection without any cable between two
distant sites. For that, two identical transceivers, each installed on one site
and aligned one facing each other, provide a point-to-point connectivity.
This configuration makes possible data transfer from one terminal to the
distant sites. For that, two identical transceivers, each installed on one site
and aligned one facing each other, provide a point-to-point connectivity.
This configuration makes possible data transfer from one terminal to the
other through the air over an optical wavelength carrier, the IR.
The installation of such a link can be summed up in 4 stages:
♦
Site survey
♦
Installation of the infrastructure
♦
Mounting of the equipment
♦
Aiming procedure
Always use appropriate safety equipment and
procedures when working with electrical
equipment and when working on roofs
equipment and when working on roofs
.
A