Nortel Networks Option 11C Mini Manuale Utente
Page 176 of 332
Chapter 13 — Installing and connecting the cross-connect terminal
553-3021-209
Standard 3.00
April 2000
Procedure 21 describes how to install the Krone Test Jack Frame for the UK.
Procedure 21
Installing the Krone Test Jack Frame (UK)
Installing the Krone Test Jack Frame (UK)
1
Refer to the equipment layout plan to determine where to place
the cross-connect terminal.
the cross-connect terminal.
2
Layout the terminal blocks as shown in Figure 51.