Eaton Electrical Series NRX Manuale Utente

Pagina di 4
Effective 10/08
For more information visit: www.eaton.com/seriesnrx
3
IL01301016E
Universal Bus Adapter 
Proceed with the following 3 steps:
Step 1: Bolt a universal bus adapter
to the vertically positioned mounting
holes of a primary terminal pad for a
horizontal bus connection or to the
horizontally positioned mounting
holes for a vertical bus connection as
shown using the hardware provided.
Torque the bolted connection to 120
in-lbs (13.6 N-m) using a torque
wrench. 
Step 2: Complete all six adapter
connections (eight for 4-pole) in a
similar fashion.  The line and load
adapters can be mounted in opposite
directions as shown. 
Step 3: Reverse the procedure just
described to remove the adapters.
Cable Adapter 
Proceed with the following 4 steps:
Step 1: A cable adapter can be bolt-
ed directly to the straight bus
adapter using the hardware provided
as shown.  Torque the bolted con-
nection to 240 in-lbs (27 N-m) using
a torque wrench. 
.  
Step 2: Complete all six cable
adapter connections (eight for 4-
pole) in a similar fashion.  Make cer-
tain that the adapters are mounted
pointing in the proper direction as
shown. 
Step 3: Reverse the procedure just
described to remove the adapters.
Step 4: When making the actual
cable connections, properly torque 
Step 1
Step 2
Step 1
Step 2
6
For more information visit: www.eaton.com/seriesnrx
Effective 10/08
IL01301016E