Cisco Systems Cisco 12816 Manuale Utente
3-3
Cisco 12016, Cisco 12416, and Cisco 12816 Router Installation and Configuration Guide
OL-11495-01
Chapter 3 Installing the Router
Pre-Installation Considerations and Requirements
Required Tools and Equipment
Before you begin the rack-mount installation, you must read and understand the
information in the
information in the
and have the
following tools and equipment:
•
ESD-preventive wrist strap
•
Number 1 and number 2 Phillips screwdrivers
•
1/4-inch (6.35-mm) and 3/16-inch (4.5-mm) flat-blade screwdrivers
•
Tape measure
•
Level (optional)
•
3/8-inch (10-mm) nutdriver (for systems equipped with the DC-input power
shelf)
shelf)
•
9/16-inch (14-mm) wrench (for chassis hold-down bolts and pallet hold-down
bracket bolts)
bracket bolts)
•
3/4-inch (19-mm) socket and ratchet wrench
Unpacking and Positioning the Router
Follow the unpacking instructions that came with the router and use a safety hand
truck to move the router to the location where it is being installed in a rack.
truck to move the router to the location where it is being installed in a rack.
Save the packaging materials in case the router has to be repackaged to be shipped
again.
again.