Cisco Systems Cisco 12816 Manuale Utente

Pagina di 416
 
7-77
Cisco 12016, Cisco 12416, and Cisco 12816 Router Installation and Configuration Guide
OL-11495-01
Chapter 7      Maintaining the Router
Removing and Replacing the DC-Input Power Shelf
Troubleshooting the DC Power Shelf Installation
Use the following procedure to troubleshoot the DC power shelf if it is not 
operating properly after installation.
Step 1
Make sure that the power shelf is seated properly:
  •
The jackscrew is tightened securely.
  •
The captive screws on the flanges are tightened securely.
Step 2
Make sure each power supply is seated properly:
  •
Eject and reseat the PEM.
  •
The captive screw on the ejector lever is tightened securely.
  •
The power switch is in the on (1) position (2400 W only).
Step 3
Make sure the router is powered on and that all power cords are connected 
properly:
  •
All power cables are securely connected to their terminal studs on the back 
panel.
  •
Each pair of PEM power cables is connected to a dedicated 60 A DC service.
  •
The source DC circuit breaker is switched on.
  •
The PEM circuit breaker is switched on (2000 W only).
  –
If the circuit breaker does not stay switched on, check the polarity of the 
power cables to the PEM.
Note
A PEM trips its circuit breaker if it detects a reverse-polarity 
condition. This condition does not damage the PEM and it should 
operate properly after the polarity is corrected.