Proxim 70443r2 Manuale Utente

Pagina di 15
Tsunami QuickBridge II T1/E1 Quick Install Guide 
Copyright © 2005 Proxim Corporation.  All rights reserved. 
3
 
 
STEP 2.  UNPACK THE SHIPPING BOX CONTENTS 
The product’s shipping boxes should be left intact and sheltered until arrival at the installation site.  Carefully 
unpack the Tsunami QuickBridge II shipment and check for any shipping damage or missing parts.  There are 
two sets of equipment in the box, as displayed in the following figure. 
 
 
The Tsunami QuickBridge II T1/E1 Quick Install Guide and a Documentation and Software CD also are included 
in the shipment.  (Extra screw-on caps to seal unused connector ports are also provided.) 
 
Contact Technical Support regarding any missing or damaged parts.   
Notes:   
(1)  If the shipping container shows signs of damage, immediately notify the transportation company.  Upon 
receipt, inspect contents to ensure no parts are missing or damaged. 
(2)  Save the original shipping boxes to re-use for shipping the equipment back to the factory, for storage, or for 
re-shipping the equipment to another location.