NEC IP8800/S6300 Manuale Utente

Pagina di 250
6.   
Line Test
156
Figure 6-3: Execution Result Example of the test interfaces command and the no test interfaces 
command [IP8800/S3600] [IP8800/S2400]
> inactivate gigabitethernet 0/1
> test interfaces gigabitethernet 0/1 internal interval 2 pattern 4 
 
> no test interfaces gigabitethernet 0/1
> activate gigabitethernet 0/1
Date 2005/11/10 00:20:21 UTC
Interface type             :100BASE-TX
Test count                 :12        
Send-OK                    :12             Send-NG                 :0
Receive-OK                 :12             Receive-NG              :0
Data compare error         :0         
Out buffer hunt error      :0              Out line error          :0
In CRC error               :0              In frame alignment      :0
In monitor time out        :0              In line error           :0
H/W error                  :none
(2) Checking frame loopback at a loop connector
Execute the loop connector loopback test to check frame loopback at a loop connector. Before performing loop 
connector loopback test or connecting the loop connector, use the inactivate command to set the port in the 
inactive state. To end the test, restore the connection and use the activate command to change the port from inactive 
to active. In this test, test frame loops back at a loop connector connected to this system to check for the NIF failure 
[IP8800/S6700] [IP8800/S6600] [IP8800/S6300] and system failure (including RJ45 connector and transceivers) 
[IP8800/S3600] [IP8800/S2400]. This test is available for all line types.
For each line type, remove the cable of the test target port number and connect the loop connector for each line type to 
execute the test. Note that, if the loop connector is not connected or the appropriate loop connector for the port is not 
connected, the test cannot be successfully executed.
IP8800/S6700, IP8800/S6600, and IP8800/S6300
A case of test conducted on Port 1 of NIF 1 at a transmission interval of one second after the cable is removed and 
the loop connector for each line type is connected is shown as a test example.
Execute the test interfaces command and the no test interfaces command in this order from the 
operation terminal.
> inactivate gigabitethernet 1/1  [Enter]
 
(Connect the loop connector to the corresponding port.)
 
> test interfaces gigabitethernet 1/1 connector  [Enter]
 
(Wait about 1 minute.)
 
> no test interfaces gigabitethernet 1/1  [Enter]
 
(Remove the loop connector from the corresponding port and restore the connection.)
 
> activate gigabitethernet 1/1  [Enter]
 
IP8800/S3600 and IP8800/S2400
A case of test conducted on Port 1 of NIF 0 at a transmission interval of one second after the cable is removed and 
the loop connector for each line type is connected is shown as a test example.
Execute the test interfaces command and the no test interfaces command in this order from the 
operation terminal.
> inactivate gigabitethernet 0/1  [Enter]
 
(Connect the loop connector to the corresponding port.)
 
> test interfaces gigabitethernet 0/1 connector  [Enter]
 
(Wait about 1 minute.)