NEC 151944 Manuale Utente

Pagina di 78
CHAPTER 3
ND-46550 (E)
 
Page 22
Revision 2.0
Note 1:
Set the groove on the switch knob to the desired switch position.
Note 2:
Since DAIA card acts like an FP, the SW1 for DAIA in FPs cannot be set to the same number.
Note 3:
When power is on, flip MB switch to ON (UP position) before plugging/unplugging the circuit card.
Note 4:
When the clock signal from a master office is supplied via the line between the Main Site and the Remote
Site, set the SW1-1 and SW1-2 according to settings in 
. In this case, DAIA cards (DAIA0,
DAIA1) must be mounted in PIM0. 
SW3 (Dip SW)
1
Set equalizer according to cable length between 
system and CSU.
OFF
2
OFF
3
OFF
4
Always set to OFF
JPS (Jumper pin)
Right
For mounting this card on PIM1 ~ PIM7
Left
For mounting this card on PIM0
JPR (Jumper pin)
Right
Neutral grounding on the receiving line is provided.
Neutral grounding on the receiving line is not 
provided.
Table 3-3  Switch Settings When Clock Signal Supplied From Master Office
CONDITIONS
DAIA0
DAIA1
DAIA2
REMARKS
SW1-1
SW1-2
SW1-1
SW1-2
SW1-1
SW1-2
Only one DAIA
card is provided.
ON
OFF
-
-
-
-
Clock signal is sent to 
PLO0 of MP card via 
supply route 0 (DAIA0).
Two or three DAIA
cards are provided.
ON
OFF
OFF
ON
OFF
OFF
Clock signal supply route 
is automatically changed 
to route 1 (DAIA1) if 
transmission line failure 
occurs on supply route 0.
Table 3-2  Switch Settings on PN-DAIA Card  (Continued)
SWITCH
NAME
SWITCH
NUMBER
SETTING
POSITION
FUNCTION
CHECK
ON
2
1
3
4
ON
SW-1 SW-2 SW-3
CABLE LENGTH
ON
ON
ON
0 - 131.2 ft. (0 - 40 m)
ON
ON
OFF
131.2 - 262.5 ft. (40 - 80 m)
ON
OFF
ON
262.5 - 394 ft. (80 - 120 m)
ON
OFF
OFF
394 - 525 ft. (120 - 160 m)
OFF
ON
ON
525 - 656 ft. (160 - 200 m)
OFF
OFF
OFF
Signal is not sent
ON
ON
OFF
Left