Black Box CRDX-A-FS-12KW Manuale Utente

Pagina di 132
724-746-5500   |   blackbox.com 
724-746-5500   |   blackbox.com 
Page 125
Appendix A: Forms
Appendix A. Forms
A.1 Checklist for Completed Installation of Cold Row DX
  1. Proper clearances for service access have been maintained around equipment.
  2. Equipment is level and mounting fasteners are tight.
  3. Field-installed piping completed.
  4. All field installed piping leaks tested.
  5. Condensate drain line connected.
  6. Water supply line connected to humidifier (if applicable). If manual cut-off valve is installed, open valve.
  7. Humidifier “On/Off/Drain” switch is in “On” position.
  8. Filters installed.
  9. Incoming line voltage matches equipment nominal nameplated rating ± tolerances.
 10. Main power wiring connections to the equipment, including ground, have been properly installed.
 11.  Customer-supplied main power circuit breaker (HACR type) or fuses have proper ratings for equipment installed.
 12. All wiring connections are tight.
 13.  Foreign materials have been removed from inside and around all equipment installed (shipping materials, construction 
materials, tools, etc.).
 14. Inspect all piping connections for leaks during initial operation.