A&D AD-4212B-101/102/201/301 Manuale Utente

Pagina di 102
 
73
T on 
off
OFF 
ON
 
OP-01 installation procedure 
1  Remove the two screws that secure the I/O unit to 
the rear of the display unit. 
2  Remove the I/O unit and disconnect the two cable 
connectors. 
3 Connect the 14-pin cable connector that was 
removed in step 2 to the OP-01 connector. 
4  Leave the 2-pin cable connector as is. 
5  Secure the OP-01 board to the rear of the display 
unit using the two screws. 
I/O timing chart 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 
The time to start re-zero operation differs, depending on the timing of the re-zero input: 
a. To enter re-zero operation without data update 
b. To enter re-zero operation after data update 
In addition, the time to complete re-zero operation is not constant due to ambient conditions 
such as external disturbance or vibration. 
Using the status signal, confirm that RE-ZERO input is accepted or re-zero operation is complete. 
 
 
“BUSY input ON” is the condition that pin 7 is connected to input signal GND (pin 3). 
 
"RE-ZERO input ON" is the condition that pin 9 is connected to input signal GND (pin 3). 
T int  Data output interval 
Approx.  100  msec (Approx. 200 msec when the 
data refresh rate is 5 times/second.)   
T str  Strobe pulse width 
Approx.  70  msec (Approx. 170 msec when the 
data refresh rate is 5 times/second.) 
T st 
Data setup 
10 
μsec or less 
 
Data refresh rate 
μsec or less 
 
 
“Switch input ON” is the condition that is connected to input signal GND (pin 3). 
 
 
 
 
 
 
T on, T off : 100 m sec or longer 
5
5
OP-01
3
4