IBM 9TS Manuale Utente

Pagina di 208
 162
Hardware Maintenance Manual: IBM PC Server/Enterprise Racks
 
 
Figure 72. Installing the Rack PDU on the vertical mounting plate
3.
If you have a second M/PDU device to install, install it on the vertical mounting 
plate with four M3x5 screws that come with the second device.
Figure 73. Installing a second Rack PDU
4.
Install the vertical mounting plate 
c2d in the side of your rack cabinet with four 
M6 screws and nuts that come with this option.  Make sure that the three-
connector side of the Rack PDU is facing the rear of your rack cabinet, and leave 
room between the vertical mounting plate and the rear EIA mounting flanges for 
the cable-management bracket 
c1d.