GenTran R1020 Manuale Utente

Pagina di 4
 
Transferring from Generator Power to Utility Power: 
1. 
On the Power Center, turn OFF Generator MAIN breaker and turn ON Utility MAIN breaker.  On 200 amps Main breaker models, this will require sliding the 
interlock mechanism up with the left hand while turning ON the 200 amp circuit breaker. 
2. 
Turn ON any branch circuit breakers in the Power Center and Main Load center that are OFF. 
3. 
Shut down the generator, following the procedures in the generator Owner’s Manual. 
4. 
Unplug the power cord from the Power Center and then the generator. 
5. 
Let the generator cool down before storing in a dry, secured location. 
6. 
To ensure that your generator will work properly when you need it, it is important to start and run your generator under load regularly and keep the tank 
filled with fresh fuel.  Perform the above steps at least ONCE A MONTH to keep the generator properly “exercised.”  
 
 
TABLE 2 - Wire Connector Usage Chart: 
WIRE SIZE 
12 
10 
14 
Red NA  NA NA 
12 
Red Red  NA NA 
10 
NA Red NA NA 
NA NA Blue 
Blue 
NA NA Blue 
Blue 
 
TABLE 3 – Compatible Circuit Breaker Types: 
 
Compatible GFCI, Arc-Fault/ Surge Protection Circuit Breakers: 
♦  Siemens QP, QT, QPH, HQP, QPF, QPHF, QFP, QE, QEH   
♦     Siemens: QPF (GFCI), QAF (Arc Fault), QP (Surge Protector) 
♦  Cutler Hammer/Westinghouse Series BD, BR, BQ, GFC 
♦  Challenger Type A, C, HAGF  
♦  Square D Series HOM 
♦  GE Series THQL 
 
WIRING DIAGRAMS: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 Gen/Tran Corporation 
P.O. Box 1001, Alpharetta, GA  30009-1001 
Toll Free: 1-888-GEN-TRAN   Fax:  770-552-7756 
www.gen-tran.com 
© 2003 Gen-Tran Corporation.  All Rights Reserved.  PowerStay is a trademark of Gen-Tran Corporation     
 
PN XXXXX  Rev A  6-12-03