GE Power Supply Manuale Utente

Pagina di 21
 
OPM_GTU_19X_1K0_3K0_XUS_V014
 
2
 
GT-UL Series: User manual 1.2 (US)
 
Digital Energy
 GT Series
g
 
 
 
 
 
CONTENTS 
 
 
 
 
IMPORTANT SAFETY INSTRUCTIONS .............................................. 3 
 
1.1 Save these instructions 
 1.2 
General 
 1.3 
Installation 
 1.4 
Batteries 
 1.5 
Transport/storage 
 
1.6 FCCIS Interference statements 
 
 2 
INSTALLATION...................................................................................... 6 
 2.1 
Package 
contents 
 2.2 
Location 
 2.3 
Rear 
panel 
 2.4 
Installation 
 
2.4.1 Mounting in a 19” enclosure 
 2.4.2 
Vertical 
installation 
 
2.4.3 Connecting an external battery pack 
 
2.4.4 Connecting the RS232/dry contact interface 
 
2.4.5 Connecting the load 
 
2.4.6 Connecting to the utility supply 
 
2.4.7 Checking the site-wiring fault LED 
 
 3 
OPERATION ........................................................................................ 10 
 
3.1 Operation Panel 
 3.2 
Start-up 
 
3.2.1 Start-up, utility power available 
 
3.2.2 Start-up, utility power not available (‘cold start’ or ‘battery start’) 
 
3.3 Use: Normal Operation 
 3.3.1 
Normal 
operation 
conditions 
 3.3.2 
Normal 
operation 
indications 
 3.3.3 
UPS 
self-test 
 
3.3.4 Silencing the buzzer 
 
3.3.5 Switching off 
 3.4 
Use: 
Abnormal 
Conditions 
 3.4.1 
On 
battery 
 
3.4.2 Battery low 
 3.4.3 
Overload 
 
3.4.4 Bypass operation 
 3.4.5 
Replace 
battery 
 3.4.6 
Short 
circuit 
 
 4 
COMMUNICATION .............................................................................. 14 
 4.1 
Description 
 4.2 
RS232 
 
4.3 Dry contact 
 
4.4 SNMP plug-in card (optional) 
 
 5 
OPTIONAL 
FEATURES....................................................................... 17 
 5.1 
Extended 
Runtime 
 
5.2 TVSS (Transient Voltage Surge Suppressor) 
 
 6 
MAINTENANCE ................................................................................... 17 
 
6.1 General maintenance 
 6.2 
Batteries 
general 
 6.3 
Batteries 
replacement 
 
6.3.1 Battery replacement procedure 1kVA 
 
6.3.2 Battery replacement procedure 1.5/2.2kVA 
 
6.3.3 Battery replacement procedure 3kVA 
 
6.4 Recycling the UPS at the end of service life 
 
 7 
TROUBLESHOOTING......................................................................... 19 
 
 8 
SPECIFICATIONS ............................................................................... 20