Cisco Systems 124792 Manuale Utente
C H A P T E R
2-1
Cisco AC/DC Power System User Guide, R1.0
May 2006
2
System Installation
This provides step-by-step instructions for installing a Cisco AC/DC Power System. If you are installing
a new system, begin with the
a new system, begin with the
. If you are upgrading an existing
system, go to the
for instructions.
2.1 Pre-Installation
The following information should be reviewed before attempting to install the Cisco AC/DC Power
System.This section includes shelf markings, tools, equipment, and an installation checklist. Refer to the
System.This section includes shelf markings, tools, equipment, and an installation checklist. Refer to the
before beginning installation.
Note
Each system installation is unique, so please review specific site requirements and system configurations
before installing the system.
before installing the system.
2.1.1 Ground Symbol
shows the ground symbol located on the Cisco AC/DC Power System.
Figure 2-1
Ground Symbol
2.1.2 Tools Required
The following tools and parts are required for safe installation of the Cisco AC/DC Power System:
•
Digital multimeter
124774