ICP DAS USA MSM-6226 Manuale Utente

Pagina di 295
Publication date: March., 2011 
 Revision A1
 
 
•  
TP Port and Cable Installation
 
  In  the  switch,  TP  port  supports  MDI/MDI-X  auto-crossover,  so  both  types  of 
cable,  straight-through  (Cable  pin-outs  for  RJ-45  jack  1,  2,  3,  6  to  1,  2,  3,  6  in 
10/100M  TP;  1,  2,  3,  4,  5,  6,  7,  8  to  1,  2,  3,  4,  5,  6,  7,  8  in  Gigabit  TP)  and 
crossed-over (Cable pin-outs for RJ-45 jack 1, 2, 3, 6 to 3, 6, 1, 2) can be used. 
It means you do not have to tell from them, just plug it. 
 
  Use Cat. 5 grade RJ-45 TP cable to connect to a TP port of the switch and the 
other  end  is  connected  to  a  network-aware  device  such  as  a  workstation  or  a 
server. 
 
  Repeat  the  above  steps,  as  needed,  for  each  RJ-45  port  to  be  connected  to  a 
Gigabit 10/100/1000 TP device. 
 
Now, you can start having the switch in operation. 
 
••
• 
  
 
Power On 
The  switch  supports  100-240  VAC,  50-60  Hz  power  supply.  The  power 
supply will automatically convert the local AC power source to DC power. It does not 
matter whether any connection plugged into the switch or not when power on, even 
modules as  well. After the  power is  on, all LED  indicators  will light  up immediately 
and then all off except the power LED still keeps on. This represents a reset of the 
system. 
 
  
 
••
• 
  
 
Firmware Loading 
After  resetting,  the  bootloader  will  load  the  firmware  into  the  memory.  It  will 
take  about  30  seconds,  after  that,  the  switch  will  flash  all  the  LED  once  and 
automatically performs self-test and is in ready state.