Q-Logic SANBOX2-64 Manuale Utente

Pagina di 198
4 – Installation
Installing a Switch
59043-01 A
4-7
d.
About 10 seconds later, the switch is operational: the Input Power LED 
remains illuminated, the Heartbeat LED flashes steadily, and the two 
remaining LEDs are extinguished. If the Heartbeat LED blinks steadily 
about once per second, the POST was successful and you can 
continue with the installation process. Any other blink pattern indicates 
that an error has occurred. Refer to 
 for more information about the error blink pattern.
4.
Confirm that the Output Power LEDs on both power supplies are illuminated. 
If not, check the power cords and the AC voltage source. Refer to 
 for more information about 
troubleshooting procedures.
4.2.4
Connect the Management Workstation to the Switch
Connect the management workstation to the switch in one of three ways:
Indirect Ethernet connection from the management workstation to the switch 
RJ-45 Ethernet connector through an Ethernet switch or a hub. This requires 
a 10/100 Base-T straight cable as shown in 
With this method, 
you can manage the switch with SANbox Manager or the CLI.
Direct Ethernet connection from the management workstation to the switch 
RJ-45 Ethernet connector. This requires a 10/100 Base-T cross-over cable 
as shown in 
. With this method, you can manage the switch with 
the SANbox Manager application or the CLI.
Serial port connection from the management workstation to the switch RS-
232 connector. This requires a null modem F/F DB9 cable as shown in 
. With this method, you can manage the switch with the CLI.
Figure 4-3.  Ethernet and Serial Cable Connections
8
1
8
1
2
7
6
5
4
3
8
1
2
7
6
5
4
3
8
1
8
1
2
7
6
5
4
3
8
1
2
7
6
5
4
3
8
1
2
7
6
5
4
3
9
8
1
2
7
6
5
4
3
9
1
6
5
9
Indirect Ethernet 
RJ-45 Connection
Serial RS-232 
Connection
Direct Ethernet 
RJ-45 Connection