RuggedCom m2200 Manuale Utente

Pagina di 29
17 
© 
2008 RuggedCom Inc. All rights reserved 
 
Rev105
 
4.3  Dielectric Strength (HIPOT) Testing 
 
For dielectric strength (HIPOT) testing in the field, users must remove the metal jumper located on 
terminal 2, 4, and 6 of the power supply terminal block.  This metal jumper connects transient 
suppression circuitry to chassis ground and must be removed in order to avoid damage to transient 
suppression circuitry during HIPOT testing.  Figure 9 shows the proper HIPOT test connections 
and should be followed to avoid damage to the device.   
  
 
Figure 9: Dielectric Strength (HIPOT) Testing