3com 8807 Manuale Utente
![3com](https://files.manualsbrain.com/attachments/960452ff43b9899cbcffced60c87abf956e7967a/common/fit/150/50/f6ac125d7af2cf40fec58935fa6d4bf71457a57efe50bee91208a434f325/brand_logo.jpeg)
4
S
WITCH
I
NSTALLATION
The Switch 8800 Family shall be installed indoors in a fixed place.
Confirming
Installation
Preparation
Installation
Preparation
■
Make sure that you have read Chapter 3 Installation Preparation carefully.
■
All requirements mentioned in Chapter 3 Installation Preparation have been
met.
met.
Installation Flow
Figure 33 Installation Flow
Start
Confirm preparations
Check installation site
Install cabinet
Install chassis and
other components
Connect PGND wire/power cord
Insert I/O modules or
Application modules
Cabling rack and fan tray
Connect cables to I/O modules
or Application modules
Power distribution box in cabinet