GarrettCom Magnum 6KQ Manuale Utente

Pagina di 56
Magnum 6KQ Managed Field Switch Installation and User Guide             (04/07) 
 
 
19
www  GarrettCom  com
.
.
Example 3.  
In another application in an industrial environment, a 12 port Nebs 
compliant, -24VDC managed switch is required to meet the fiber and copper connections 
to cover the wider area of video CCTV. The switch must be SNMP enabled and managed 
to easily monitor the whole setup.  
The Magnum managed field switch easily qualifies for this requirement with the various 
features and modularity it has. Loaded with MNS-6K management software, the field 
switch provides a very effective and economical solution for the video -vignette 
environment. 
The security features (e.g. port-security, VLANs, SNMPv3, secure telnet, etc.) also boost 
the Magnum managed switches to provide a very effective and reliable solution. The 
modularity feature to support both copper and fiber at either 10/100/1000Mb speeds 
easily meets the various speeds of legacy and future broadband requirements. 
 
In a fast growing secure video environment, the 6KQ is a reliable and secure 
solution. The modular design of the Magnum 6KQs, provide a wide range of copper/fiber 
options to meet requirements. The Gigabit uplink for storage or broadband uplink allows 
the telecom user a very effective solution to store their sensitive data securely.  
 
Fig. 2.4c
: Magnum 6KQs deployed in a video security CCTV application for 
monitoring and securing the premises 
 
3.0  
Installation 
Before installing the equipment, it is necessary to take the 
following precautions: 
1.) 
If the equipment is mounted in an enclosed or multiple rack 
assembly, the steady-state long-term environmental temperature 
around the equipment must be less than or equal to 60
0
C. 
2.) 
If the equipment is mounted in an enclosed or multiple rack 
assembly, adequate airflow must be maintained for proper and 
safe operation. 
3.) 
If the equipment is mounted in an enclosed or multiple rack 
system, placement of the equipment must not overload or load 
unevenly the rack system. 
4.) 
If the equipment is mounted in an enclosed or multiple rack 
assembly, verify the equipment’s power requirements to prevent 
overloading of the building/s electrical circuits. 
5.)  
If the equipment is mounted in an enclosed or multiple rack 
assembly verify that the equipment has a reliable and 
uncompromised earthing path.
 
 
This section describes installation of the 
Magnum 6KQ Switches, as well as connection of the 
various Ethernet media types. 
 
3.1 
Locating Magnum 6KQ Switches 
For vertical panel mounting and wall mounting, see 
Section 3.3.1. 
For vertical DIN-Rail mounting, see Section 3.3.