Bad Boy Mowers 02.9812.0001C Manuale Utente

Pagina di 102
B
AD
 B
OY
™ S
POT
 L
UMINAIRE
 U
SER
 M
ANUAL
5 4
02.9812.0001C
Group Test
The Group Test menu allows multiple Bad Boy™ luminaires to be run through a configurable test 
sequence when chained together via DMX512 or Ethernet. (Refer to 
page 19 for more information about daisy-chaining.)
To perform a group test:
Step 1. At Group Test screen, select options to run: Pan/Tilt, Intensity, Colors, Gobos, and/or Zoom.
Step 2. Select test option: concurrently (all selected tests are run at once) or sequentially (tests are 
run one at a time as each one finishes).
Step 3. Press START to begin testing. All Bad Boy luminaires connected to the main fixture (now 
referred to as the "Master") will become "Slaves" and follow the test routine set on the 
Master in an endless loop. 
Step 4. To stop the test sequence, press STOP on the Master.
While in group test, a Master can manually change certain values by using the Manual Control screen. 
From here, you can adjust the levels of parameters not active in the test sequence. For example, if a test 
were running on gobos and colors, you can adjust the pan and tilt to point the Master and all Slaves to 
a position where it will be easier see the output of the fixtures.