Zephyr CPA-E54ASX Manuale Utente
18
13. Optional duct cover installation:
a. Remove the support bracket from the Duct Cover
assembly and attach it to the ceiling with 2 drywall
anchors and screws
Note: The printed index on the bracket must match
the center line previously drawn (See installation
step
assembly and attach it to the ceiling with 2 drywall
anchors and screws
Note: The printed index on the bracket must match
the center line previously drawn (See installation
step
2).
Conduit
Duct
Position
reference
reference
Position
reference
reference
CenterLine
Duct cover
support barcket
support barcket
Inst
allation - Inst
alling the Duct Covers
Unscrew the 4 screws that fix the section of the Duct
Cover (Starting collar) and release all parts.
Install the upper section to the support bracket with
2 screws.
Note: Check that joined seam is positioned towards
the back.
Note2: The lower section (Collar) of the duct cover
assembly must be installed at the end of the
installation with 2 screws.
Cover (Starting collar) and release all parts.
Install the upper section to the support bracket with
2 screws.
Note: Check that joined seam is positioned towards
the back.
Note2: The lower section (Collar) of the duct cover
assembly must be installed at the end of the
installation with 2 screws.
Support
Bracket
Bracket
Upper
section
section
Lower
section
(Collar)
section
(Collar)