Husqvarna 966629602 Manuale Utente

Pagina di 84
ASSEMBLY
English
 –
 15
1155849-49 Rev. 2 2013-03-22
Assembling the blow pipe and 
control handle
Connect the blower and control pipe with the flexible 
hose. Clamp both ends of the flexible hose in place.  
Use the accompanying hardware.
1
Flexible hose
2
Control pipe
3
Clamp
4
Clamp
NOTE! 
Lubricate the pipes a little to facilitate assembly.
Fasten the handle holder to the control pipe and 
tighten the knob on the holder. Please make sure to 
align the handle holder with the convex of the control 
pipe.
Adjust the position and angle to achieve a comfortable 
working position,  and tighten.
Use the clamp to fasten the cabling to the flexible 
hose. (BTS)
Connect the straight pipe and pipe end. Push the 
pipes together and turn them so they lock.
Accessories
Handlebar
Disassemble the intermediate pipe. Disassemble the 
knob from the holder and puch the holder on to the holder 
pipe. Assemble the knob and tighten.
Assemble the intermediate pipe.
If higher air speed is required, the round blow pipe is 
replaced by the flat nozzle.
3
1
4
2
H1155849-49,560,570,580.fm  Page 15  Friday, March 22, 2013  2:31 PM